Anderson, S D, Patil, S S, Gibson, G E and Sullivan, G R (2004) Owner–Contractor Work Structures: Process Approach. Journal of Construction Engineering and Management, 130(05), 680–90.

Chinowsky, P S and Diekmann, J E (2004) Construction Engineering Management Educators: History and Deteriorating Community. Journal of Construction Engineering and Management, 130(05), 751–8.

Hanna, A S and Gunduz, M (2004) Impact of Change Orders on Small Labor-Intensive Projects. Journal of Construction Engineering and Management, 130(05), 726–33.

Hassanein, A and Moselhi, O (2004) Planning and Scheduling Highway Construction. Journal of Construction Engineering and Management, 130(05), 638–46.

Jung, Y and Woo, S (2004) Flexible Work Breakdown Structure for Integrated Cost and Schedule Control. Journal of Construction Engineering and Management, 130(05), 616–25.

Li, K Y K and Chan, A T (2004) Management of Radon in Tunnel Drilling. Journal of Construction Engineering and Management, 130(05), 699–707.

Mattila, K G and Bowman, M R (2004) Accuracy of Highway Contractor’s Schedules. Journal of Construction Engineering and Management, 130(05), 647–55.

Park, M and Peña-Mora, F (2004) Reliability Buffering for Construction Projects. Journal of Construction Engineering and Management, 130(05), 626–37.

Scott, S and Harris, R A (2004) United Kingdom Construction Claims: Views of Professionals. Journal of Construction Engineering and Management, 130(05), 734–41.

Senghore, O, Hastak, M, Abdelhamid, T S, AbuHammad, A and Syal, M G (2004) Production Process for Manufactured Housing. Journal of Construction Engineering and Management, 130(05), 708–18.

  • Type: Journal Article
  • Keywords: Manufactured homes; Production planning; Production engineering; Simulation; Simulation models; building; construction; production planning; production engineering;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(708)
  • Abstract:
    A manufactured home is completely built in a controlled factory environment. Despite a large share of the market, the manufactured housing industry has a long way to go towards streamlining its production process. The objective of this paper is to map the production process of a manufactured housing factory and to demonstrate via simulation how the process can be improved. The production process including assembly, feeder, and storage stations were mapped using data from several manufactured housing plants and in-depth case studies at two plants in northern Indiana. The case study plants were also used for collecting cycle-time data for developing the simulation model for the roofing process. Subsequently, four “what if” scenarios were conducted to illustrate potential improvements to the production process. The efforts presented in this paper are part of on-going research sponsored by the National Science Foundation under the Partnership for Advancement of Technology in Housing (PATH) initiative.

Touran, A, Atgun, M and Bhurisith, I (2004) Analysis of the United States Department of Transportation Prompt Pay Provisions. Journal of Construction Engineering and Management, 130(05), 719–25.

Trigunarsyah, B (2004) Constructability Practices among Construction Contractors in Indonesia. Journal of Construction Engineering and Management, 130(05), 656–69.

Wong, C H (2004) Contractor Performance Prediction Model for the United Kingdom Construction Contractor: Study of Logistic Regression Approach. Journal of Construction Engineering and Management, 130(05), 691–8.

Zhang, X (2004) Improving Concessionaire Selection Protocols in Public/Private Partnered Infrastructure Projects. Journal of Construction Engineering and Management, 130(05), 670–9.

Zhong, D, Li, J, Zhu, H and Song, L (2004) Geographic Information System-Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes. Journal of Construction Engineering and Management, 130(05), 742–50.